Hi,
In previous versions the last two lines in the log for a task included the Task Name. In the Reflector logs one of the lines does not have the task name, just "this task".
Is it possible to replace the task name in the duration line please? I use a batch script to make a report and it needs the task name to extract the relevant lines.
ie Old Logs:
2021-10-26 01-56 Total backup time for "Staff Area": 0 hours, 22 minutes, 58 seconds
2021-10-26 01-56 ** Backup done for the task "Staff Area". Errors: 0. Processed files: 605107. Backed up files: 15. Total size: 11.96 MB **
Reflector Logs:
2021-11-05 23:04:27 ** Backup for task "AdminFiles" ended. Number of backed up files: 251377. Created folders: 5365. Backup size: 75.39 GB. **
2021-11-05 23:04:27 *** Number of errors: 0. Time elapsed for this task: 4 hours, 4 minutes, 25 seconds. ***
In previous versions the last two lines in the log for a task included the Task Name. In the Reflector logs one of the lines does not have the task name, just "this task".
Is it possible to replace the task name in the duration line please? I use a batch script to make a report and it needs the task name to extract the relevant lines.
ie Old Logs:
2021-10-26 01-56 Total backup time for "Staff Area": 0 hours, 22 minutes, 58 seconds
2021-10-26 01-56 ** Backup done for the task "Staff Area". Errors: 0. Processed files: 605107. Backed up files: 15. Total size: 11.96 MB **
Reflector Logs:
2021-11-05 23:04:27 ** Backup for task "AdminFiles" ended. Number of backed up files: 251377. Created folders: 5365. Backup size: 75.39 GB. **
2021-11-05 23:04:27 *** Number of errors: 0. Time elapsed for this task: 4 hours, 4 minutes, 25 seconds. ***
Statistics: Posted by flippertie2 — 08 Nov 2021, 16:48